Permit Center Review Time Frames

Print
Share & Bookmark, Press Enter to show all options, press Tab go to next option

Process times are for projects with approved entitlements.

Below are estimated review times for initial submittal plan check. All review times are subject to workload and processed in the order received.

All review times do not include weekends or holidays. 

Type 5 Day review 7 Day Review 15 Day Review

Residential

  • Gas Line- New or Repair 
  • Heating and Air Conditioning
  • Reroof
  • Service Panel Upgrade
  • Sewer Line Replacement
  • Water Heater Replacement
  • Water Line Replacement
  • Water Repipe
  • Bathroom Remodel
  • Detached Accessory Structures <120 sf (Planning Review Only)
  • Electrical Vehicle Charging Station
  • Fences <6 ft (Planning Review Only)
  • Heating & Air Conditioning
  • Kitchen Remodel
  • Masonry Chimney Repair
  • Minor Interior Remodel
  • New Lights, Outlets, Switches
  • Portable Package Spas
  • Siding or Stucco Applications
  • Skylight Installation
  • Solar Systems - Pools
  • Voluntary Seismic Upgrade
  • Window Installation - New
  • Window Replacement
  • Decks
  • Fireplace Inserts
  • Fire Sprinklers (SFD)
  • Flag Pole
  • Patio Covers/ Arbors
  • Pool or Spa in Ground
  • Photovoltaic Systems over 10kW
  • Remodel (No Structural Calculations)
  • Revisions
  • Seismic Upgrade/Foundation Repair
  • Truss Calculations

Commercial / Industrial

  • Irrigation Controller
  • Temporary Power Poles
  • Electrical
  • Heating & Air Condition (No Calculations)
  • Sign Monument Under 6' Feet
  • Signs Wall Mounted
Type 25 Day Review 45 Day Review 60 Day Review

Residential

  • Accessory Structures
  • Addition
  • ADU
  • Detached Garage
  • Fences with Calculations
  • Fire Alarm System (Multi-Family)
  • Fire Sprinklers (Multi-Family)
  • Major Remodel (Structural Calculations)
  • Patio Enclosure
  • Retaining Wall with Calculations
  • Tract Plot Plans
  • Truss Calculations for Tracts
  • Duplex
  • Single Family Residence
  • Tract Master Plan
  • Apartment Building/Condos

Commercial / Industrial

  • Above Ground Tanks
  • Canopies
  • Deferred Submittal Items
  • Demising Wall
  • Exterior Work
  • Fences with Calculations
  • Fire Sprinklers
  • Fire Alarm System
  • Flag Pole
  • Gasoline Dispenser
  • Generator (Natural Gas)
  • Kitchen Remodel
  • Heating & Air Condition w/ Calculations
  • Industrial Machines
  • Kitchen Hoods
  • Parking Lot Expansion
  • Partitions
  • Pedestrian Bridge
  • Photovoltaic Systems
  • Racking/High Pile Storage no Hazmat
  • Retaining Wall with Calculations
  • Revisions/Resubmittals
  • Sales Office in Garage
  • Sales Trailer
  • Seismic Upgrade
  • Signs Monument Over 6 Feet
  • Spray Booth
  • Swimming Pool
  • Tenant Improvement
  • Towers and Antennas
  • Trash Enclosures
  • Truss Calculations
  • Underground Fire Service
  • Addition
  • Grading
  • Grading with Underground Utilities
  • Site Work
  • Hazardous Uses
  • Above Ground Tanks-Gasoline, Diesel, Corrosives
  • Clean Rooms
  • Generators (diesel, propane)
  • Hazardous Use Machines
  • Process Gas Systems
  • Racking with Hazmat
  • Underground Tanks
  • Commercial or Industrial Building
  • Hotel or Motel